Online Safety Community

I joined the community because I have a question about NEC/OSHA regulations.  I'm sure I will have more :).  My question is what is the allowable distance from an MCC/control panel face to the edge of a skid or platform (modular design) on concrete?  

The NEC states that the working space must be clear of anything NOT associated with the electrical installation.  If it is electrical related, the panel face must be 6" in front of it.  

Does this mean the MCC/control panel face must be FLUSH with the edge of the skid?  Can it be 6" back?  Can it be 14" back?  What is the requirement here?  I've attached a picture for reference.

Views: 42

Attachments:

Reply to This

Take our poll!

Take our poll!

Latest Activity

Training Doyens posted events
Friday
Soujanya Naganuri posted a discussion

Flow of SAP MM and SUS Portal

SAP Material Management (MM) and SAP Supplier Self Service (SUS) and some customizable features of SAP SUS.In the Plan-Driven Procurement with Supplier Integration scenario the SAP SUS is installed and configured with SAP MM/SRM. Technically, in a classic scenario SAP SUS maybe connected with one or more MM and/or SRM back-end systems.PO is sent to SAP SUS system, in which supplier can perform the follow-on procurement process, i.e. PO response, ASN, GR response and invoice response.SAP…See More
Thursday
John Robinson posted blog posts
Thursday
Emma Miah posted a blog post

Latest Men’s Fashion Trends For Winter

Most people will agree that fashion trends use to fade, but the style is the one thing that is eternal. So, it’s always suggested that you should only follow the fashion trends that actually suits your personality. Winter is coming now it’s time to…See More
Thursday

Forum

Flow of SAP MM and SUS Portal

SAP Material Management (MM) and SAP Supplier Self Service (SUS) and some customizable features of SAP SUS.In the Plan-Driven Procurement with Supplier Integration scenario the SAP SUS is installed…Continue

Tags: sapmmcourse, sapmmonline, sapmm

Started by Soujanya Naganuri on Thursday.

PEGA Axis error: Parser already accessed

We have a PEGA frontend, from in which we're keying in double byte characters like japanese and being send to allotted java webservice through axis. this is working best when we ship singlebyte…Continue

Tags: pega_training, pega_online, pega

Started by Soujanya Naganuri Dec 6.

VMware player error on install vmware tools.

 I've installed the last version of VMware player (4.0.2) and created a virtual machine with ubuntu 10.04. However, some operations with …Continue

Tags: training, online, vmware

Started by emmablisa Dec 1.

All About QlikView

QlikViewQlik relies on sophisticated analytics that enables data discovery using an in-memory engine to analyze data for patterns not visible via SQL data structures or queries. The company’s two…Continue

Tags: Safety, Qlikview

Started by nicolewells Nov 25.

Occupational Health and Safety 5 Replies

Health and safety are important aspects of an organisation’s smooth and effective functioning.  Did you know that workplace health & safety injuries cost Australian businesses over $60 billion…Continue

Tags: Safety, and, Health, Occupational

Started by WHS Solutions. Last reply by Tara safe Nov 16.

Badge

Loading…

© 2017   Created by Safety Community.   Powered by

Badges  |  Report an Issue  |  Terms of Service